Alpha Drilling

Clients Current and completed:

1.       A-Cap Resources

Drilling for Uranium Deposits in the Serule area with RC, Hollow stem drilling and coring.

  • Drilling RC holes to 120m using slim line techniques and face sampling hammers to obtain maximum sample and minimize dust through outside return, samples are run through cyclones with double drop boxes and cone splitters with dust collectors to minimize dust on site.
  • Drilling hollow stem auger to 18m to obtain undisturbed core samples that haven’t been water or air affected.
  • Drilling PQ core to 100m maximum using TT split tube for core recovery and presentation

 

 2.       African Energy

Drilling for Uranium and Coal Deposits in the Serule area using RC and core drilling

  • Drilling RC holes to 130m using slim line techniques and face sampling hammers to obtain maximum sample and minimize dust through outside return, samples are run through cyclones with double drop boxes and cone splitters with dust collectors to minimize dust on site.
  • Drilling HQ3 triple tube to 150m to obtain maximum core recovery and presentation.

 

  3.       Tlou Energy

Drilling for CBM Exploration in Kalahari Basin and Nata Area using DTH, Mud rotation and HQ, PQ coring.

  • Drilling 14” to 80m and pressure cementing 10” welded steel casing then running 6” hammer to 250m then changeover to 6” PCD and drill to 600m then running 4 ½” casing to bottom and pressure cementing.
  • Drilling HQ3 triple tube to 800m to obtain maximum core recovery and presentation.

 

 4.       Impact Minerals

Drilling for Uranium Deposits in the Serule area using RC and coring.

  • Drilling RC holes to 80m using slim line techniques and face sampling hammers to obtain maximum sample and minimize dust through outside return, samples are run through cyclones with double drop boxes and cone splitters with dust collectors to minimize dust on site.
  • Drilling PQ3 triple tube to 60m to obtain maximum core recovery and presentation.

 

 5.       IAM Gold

Drilling for gold at the Mopani Gold mine, completed RC grade control drilling.

  • Drilling RC holes within the mine site on a 25 x 25 grid pattern using face sampling hammers to obtain maximum sample, samples are run through cyclones with double drop boxes and cone splitters with dust collectors to minimize dust on site.

 

 6.       Botswana Metals Limited

Drilling for Nickel in the Selebi Phikwe area using RC drilling methods.

  • Drilling RC holes to 180m using face sampling hammers to obtain maximum sample and minimize dust through outside return, samples are run through cyclones with double drop boxes and cone splitters with dust collectors to minimize dust on site